Move

September 20, 2019, has been a great day for Chassy. In the morning the moving trucks and Portugal frames arrived. It was a hard day. The moving was fast and methodical. On the very next day, the windows and doors were quickly placed.

Friday back to place. The frames were already assembled despite a problem with the arch of the doors that left a 10 cm gap. We consider this construction phase as over. It was a decisive step.